Upgrades for outdated and obsolete equipment including PLC, Governor and Fuel Controllers. Add-on HMI and SCADA systems available per customer requirements.
FUEL SYSTEMS
Upgrade the hydro-mechanical or electric-hydraulic fuel control system to the OEM approved PLC based fuel controllers. Conversion from third party non-supported proprietary fuel controllers to OEM approved PLC or GT manufacturer proprietary digital control systems. Liquid to gas fuel, Low Btu, Off gas and Dual fuel conversions.
WATER OR STREAM
Diluent injection systems for exhaust gas emissions control and / or power augmentation.
TURBINE START SYSTEMS
Chose from VFD Electric, Electric-Hydraulic, Diesel Hydraulic or Pneumatic / Gas start systems.
BLACK START SYSTEMS
Diesel engine generator sized for package black start requirements including auto-transfer switchgear.
Remanufactured Gas Turbine Generator Packages
Remanufactured gas turbine generator packages are available in the range from 4 MW to 10 MW. All remanufactured gas turbine generator packages will carry a new equipment warranty of 12 months from first operation or 18 months from shipment.
New OEM turbines are overhauled to a zero time condition.
Other major OEM equipment i.e. reduction gears and generators include complete inspections and factory functional testing prior to package final assembly and factory load testing.
Natural gas fuel, liquid fuel or dual fuel systems available with OEM approved PLC based electronic fuel control systems.